Open Trust Commons · OTCS

The constitution

Version 0.1 · Status: EXPERIMENTAL · Changing this document takes 45–90 days (see GOVERNANCE.md)

This is the constitution. It says what this project is, who decides what, and what it is not allowed to become.

Section numbers are fixed — other documents cite them — so they stay put even when the wording changes.


1. What OTCS is

A public list of projects that try to control what automated software is allowed to do, written in one shared vocabulary so they can be compared.

For each listed project we keep:

It is a governed commons, not a directory. A directory lists things. This one has written rules about who may change what, what counts as evidence, how disagreements are settled, and how the people running it can be removed. Those rules apply to the people running it too.

2. The constitutional boundary

Three separate areas of control. None may absorb another.

WhoControlsDoes not control
KTP — the Kinetic Trust ProtocolThe vocabulary and the underlying modelAny listed project; how this registry is governed
OTCS — this projectThe list, the rules for being on it, how connections and evidence are recordedAny project's own description, roadmap, releases or licence; KTP's meanings
Listed projectsThemselves — their code, roadmap, licence, and which connection points they supportThe factual record around them: dates, citations, dependencies, criticism, forks, outside tests

Listed projects do not become part of KTP. They describe themselves in a vocabulary it defines.

2a. Custody is not interpretive authority

The boundary above says what each party controls. This says what holding the record does not confer. Stated by Richard Lynes of Genesis AiX, during architectural review, better than this project had stated it:

Institutional custody must not become interpretive authority over the registered architecture.

OTCS holds records. Holding a record grants no authority to decide what the architecture it describes means, which of a project's internal documents belong to it, or whether something undisclosed satisfies a category beyond what the registered evidence establishes.

Two determinations, permanently separate records. This is the operative rule, and the one most likely to be violated by accident:

DeterminationWho makes itWhat it is about
"This record does not satisfy the requirements of this OTCS state"This project, by validating structure against a published schemaThe record
"The owner's architectural claim is false"Not this project. A dispute record, an analysis, or a named challenger — each carrying its own evidence and its own authorThe architecture

A validation failure is a statement about a record's structure. It is never a finding about the substance of what the record describes, and it must never be published in a way that reads as one. Where a reader could mistake the first for the second, the record says which it is.

The registry's right to enforce its own schema is not in question. A record that fails validation does not enter, and that is not censorship — it is the schema doing its only job. What the enforcement never becomes is a verdict on the project.

3. The three kinds of authority inside OTCS

4. The governing principle

A decision about this project may only proceed while the conditions exist to make it properly.

Every governance action has a size — how much it changes the shared system. The environment for deciding it has a capacity, made of things like: how sure we are who is participating, how good the evidence is, whether affected people were reached, whether there was time to review, and whether objections were answered.

Written formally, and cited elsewhere as such: A_g(t) ≤ E_g(t) — the size of the action must not exceed what the deliberative environment can support.

IfThen
The conditions support the decisionALLOW — ratify it
The scope or the evidence is too thinSHAPE — narrow it and try again
Deliberation was bypassed or overwhelmedDEAUTOMATE — return it to human discussion
It cannot be legitimately supported at allVETO — reject it

The bigger the decision, the more of that environment it needs.

Nothing here is permanent by default. Emergency powers expire. Every significant decision carries a date by which it must be reviewed, renewed, or lapse.

5. The canonical voting principle

Stated in full, because other documents quote it:

OTCS voting is trajectory-qualified rather than seniority-weighted. Every participant has immediate voice. Binding votes require demonstrated engagement with the proposal across time, evidence, and objection. Early contributors receive permanent provenance and may earn stewardship roles, but they do not receive permanent control merely for arriving first. Late participants may acquire equal voting standing through an explicit catch-up path.

In plainer words:

Short version: attention is the stake, time is the proof, authority stays bounded. Mechanics are in VOTING.md.

6. Conflicts of interest — declared

This project is run by one person during its early life, and that person's other work overlaps its subject. Saying so plainly is a design requirement, not a formality.

Chris Perkins (nmcitra) is at the same time:

What is done about it:

MitigationIn practice
KTP is listed under the same rules as anything elseWith honest scores, including a zero for outside evaluation
Founder-maintained connections are marked one-sidedself_asserted until someone else confirms them, exactly like everyone else's
This project's own scores are publishedWritten down 2 of 5, built 0 of 5, checked by outsiders 0 of 5
The vocabulary is tested against work it did not design forCALIBRATION.md — a standing check on whether it quietly favours KTP

Nothing is validated by the fact of being listed here. The registry does not grade its own homework, and neither does its founder.

7. Stewardship and succession

How control passes on, written down now, before this is worth controlling.

StageWhat it means
1 — nowFounder-led, declared openly, every decision on the public record
2A documented group of maintainers — triggered by the first sustained outside maintainer
3Wider governance — the group plus specification editors plus seats for affected projects
4An independent foundation or fiscal host

Moving between stages requires a constitutional-class proposal.

The trigger cannot be blocked by the founder. Once someone outside has participated substantively in the rules for 90 days or more, nominations for maintainer open. The founder cannot veto that opening. Appointment itself still requires a ratification vote.

Registering a project never conscripts anyone into helping govern the rules.

A maintainer candidate has to show: sustained participation · understanding of the boundary in §2 · disclosed conflicts · capacity to review changes · willingness to enforce the evidence rules against allies · agreement that governance happens in public.

Removal, succession and emergency powers: GOVERNANCE.md. Security incidents: SECURITY.md.

8. What registration means — and does not mean

Being listed means exactly one thing: this project made a public, attributable claim about itself.

It does not mean any of:

Evidence has to match the size of the claim. An essay is not tested infrastructure. A demo is not a standard. Code existing is not code deployed.

9. Provisional semantics

The vocabulary in version 0.1 is a hypothesis, not a finished map of the field.

The first serious outside registrants are expected to break parts of it. That is what they are for.

Changing the vocabulary, the meanings, the evidence levels, the connection points or the relationship terms requires a model-revision proposal (GOVERNANCE.md §11) — near-constitutional, with migration notes, an impact analysis and a mapping from old terms to new.

Treating the founder's current understanding of the field as settled fact is a named way this project fails. It is listed in NON-GOALS.md.

10. The right not to take part

A project may refuse to appear here. "Do not create a page in our name" is honoured.

Record stateMeaning
REGISTEREDThe project submitted it and confirmed it
OBSERVEDBuilt from public evidence, not project-controlled, used only where that is ethical and lawful — and never presented as participation
EXAMPLEAn invented record, for demonstration only

Nobody unwilling is ever made to look like a participant. Removal and refusal: GOVERNANCE.md §12.

11. Neutrality toward KTP — being listed is not agreement

This project uses KTP's vocabulary as its shared language. That language remains open to challenge, and being listed is not agreeing with it.

Being listed here does not mean a project endorses KTP, adopts its formalism, agrees with A ≤ E, accepts how it has been mapped, or recognises KTP as governing its architecture.

A project can take part while disagreeing with how it has been described. The record keeps these apart:

StateMeaning
The project's own wordsAlways controlled by the project
otcs_observedOur mapping, not theirs
project_confirmedThey agreed with our mapping
disputedThey disagree — their objection is published in their own words
unmappedNo mapping claimed

A disputed mapping is a normal state, not a defect. If outside mappings keep failing, that is evidence against the vocabulary itself (§9), and the revision process exists to act on it.

12. How this could fail

Named in advance, because an institution that has not described its own failure modes cannot be held to them.

FailureWhat happens
Not enough participationThe proposal is HELD. It never passes by default
DeadlockIt expires at its review date and returns to discussion rather than hanging forever
A maintainer's own project is affectedThey must recuse, and the recusal is recorded
A maintainer needs removingThrough the dispute process, escalating to the next stage
Emergency powersScoped, recorded, and expiring automatically after 7 days
A contested electionSettled on dated evidence. A tie holds rather than favouring the incumbent
One employer or vendor takes overDisclosed affiliations make concentration visible; it is grounds to halt a decision
Maintainers go inactiveObjective criteria trigger a review, not silent removal
A project leavesIt may withdraw; its history survives (REGISTRY-POLICY.md)
The whole thing endsThe record is archived publicly with a written account. Everything stays available

Forking is explicitly allowed and expected. Everything needed to fork — records, formats, history, tooling — is openly licensed and portable by design.

A fork is not a failure of this Commons. Being unable to fork would be.

Forks should use a different name (TRADEMARKS.md) and their own identifiers (IDENTIFIERS.md), and are encouraged to say what they changed and why.

13. Licences

Kinetic Trust Protocol © Chris Perkins (nmcitra). Distinctive KTP constructs are cited where used.